Atlantic Ave and the Turnpike
Removal and installation of 42″ watermain which included an aerial crossing over a canal, tying into the existing watermain, and installation of storm drainage for Ranger Construction Industries in Palm Beach County
Mayflower Canal Re-Stabilization
Final product for the City of Ft. Pierce after stabilization work including a mile of clearing, excavation, and reshaping of a major north-south drainage relief canal plagued by overgrowth and damaged by a major hurricane
45th Street Beautification
Installation of 54″ to 84″ RCP and ERCP within an existing canal for nearly one mile for Indian River County followed by watermain installation and directional boring
Private Marina in the City of Riviera Beach
Installing gravity sewer line as part of a very complicated project with several miles of water and sewer installation, completed in a very tight timeline with several underground conflicts and several subcontractors
SR 710 in Indiantown
Installing 36″ double barrel pipe as part of a five mile long concrete roadway construction project for Ranger Construction Industries and the FDOT
Roebuck Road
Installation of bank and shore rip rap on double barrel 60 inch diameter outfall for Hardrives, as part of a Palm Beach County roadway widening and drainage improvement project
Clematis Streetscape
Installing drainage and watermain in the heart of downtown as part of Burkhardt Construction’s beautification project for the City of West Palm Beach
Big Blue Trace
Cofferdam installation in preparation for the Village of Wellington’s road restoration project
Big Blue Trace
72 inch storm drain installation as part of the Village of Wellington’s road restoration project
Atlantic Crossing
Driving 40 ft long steel sheet piles to allow a 13 foot excavation for an underground parking garage for Urban5 Constructors and Mouw Associates
SR 710
Setting a double barrel 19×30 headwall/control structure for Ranger Construction Industries
RC-4 Canal Water Quality Improvement
View after installation of pollution control bafflebox for the City of Riviera Beach, constructed with an extensive grating system that was fabricated in house by our shop personnel
Old Pompano Water and Sewer
Installation of deep sewer for Burkhardt Construction
Florida Turnpike Golden Glades to Hollywood Boulevard
Installation of trunk line drainage for new southbound exit ramp to Hollywood Boulevard for Community Asphalt
Culvert S-377 Replacement
Weir gates installed for Asset Group and US Army Corps of Engineers at Stormwater Treatment Area 1 East in Palm Beach County
Solid Waste Authority Renewable Energy
Installation of a 7′ box culvert for Hardrives, CDM Smith, and KBR
Lakeside Ranch
Installation of 16’x18′ box culvert for the South Florida Water Management District and Dickerson Florida
Moores Creek
Placement of 32 foot CON/SPAN arch and precast headwalls and wingwalls for the City of Ft. Pierce
Moores Creek
Final product after canal reshaping and replacement of three bridges for the City of Ft. Pierce
Replacement of 84 inch culverts at Herbert Hoover Dike in Glades County
Excavation and preparation for control structure for Asset Group and the US Army Corps of Engineers
I-595 Segment C
Installation of weir control structure for Bergeron Land Development and Dragados
Town of Palm Beach Force Main Replacement
Installation of 18 inch fitting on Ocean Avenue for Burkhardt Construction
Town of Palm Beach Force Main Replacement
Installation of 18 inch fitting on Ocean Avenue for Burkhardt Construction
I-595 Segment C
Installation of 30 inch RCP between westbound SR 84 and westbound I-595 for Bergeron Land Development and Dragados